Harbor Naito subareaNorth Macadam
North of Kelly District Plan

The North Macadam Urban Renewal Area includes an under-developed upland area west of Interstate 5 and south of Interstate 405. This area is approximately 15.5 +/- acres in size, including right-of-way. The area is bounded by I-405 to the north, I-5 to the east, SW Kelly Avenue to the south and Naito Parkway / First Avenue to the west.

The land parcels in this area are anticipated to redevelop, but face significant challenges due in part to the topography, lack of connectivity, and urban constraints from multiple corridors that isolate this area from adjacent neighborhoods.

PDC, with the Bureau of Planning and the Portland Department of Transportation, has completed a planning study of this area to help identify access, circulation and development issues and propose solutions. The study program included a market analysis of the area and traffic analysis of proposed concepts. In addition, the study evaluated urban design and development opportunities. The results of this study will also inform current and upcoming studies such as the North Macadam Transportation Strategy.

The study was funded by the Oregon Department of Land Conservation & Development (DLCD) and the Oregon Department of Transportation (ODOT) through their Transportation Management Quick Response Program. Public participation included property owner meetings and public workshops.

 

Publications

Related Links



Sign-up title graphic  for PDC's News & Information E-mail Lists Go back to top of page
View the e-mail archive | Unsubscribe from our e-mail Lists
 
Find us on:  
FacebookYouTubeTwitter  



Portland Development Commission | 222 NW Fifth Ave | Portland, OR 97209-3859
Phone: 503-823-3200 | Fax: 503-823-3368
Banner picture of Portland Skyline
Background for Banner